SILKRAILS.WORDPRESS.com (GCTL8.com – FocusAsia Media Ltd

LONG BEACH, Jul 25 (FAM) – The Port of Long Beach on Monday released a draft environmental impact report examining a proposal by Southern California Edison to modify transmission and telecommunication lines crossing the Cerritos Channel.

A public hearing on the study is scheduled for 6 p.m. Wednesday, Aug. 16, in the Board Room at the Port of Long Beach Interim Administrative Offices, 4801 Airport Plaza Drive, Long Beach 90815.
 

Advertisements